九龙平特公式规律网址|分分彩单双公式规律
中文English
Welded SiloBACK

  • Specification
  • Requirement

The owner shall provide installation site for the manufacture of products based on distance less than 100 meters for our team at least 1600 meters installed formation and compacted; provide free installation three-phase 380V/250A power interface (from the product within 50 meters); provide free installation personnel living in hydropower installation site and shed (at least 8 construction workers living demand); to provide the installation site security work free of charge, B to ensure construction safety. Silo purchased parts provided by the employer, by our company free of charge to assist installation (not including the spiral machine installation assistance). But the package approach in the tank in front of the day, our company reserves the right to refuse to provide the service.

九龙平特公式规律网址 我爱玩棋牌 斗地主 幸运农场果蔬版走势图 宁夏11选5走势 股票融资功能 黑龙江十一选五开奖爱 网络棋牌频道直播间辽 万达股票 体彩快中彩开奖结果 海南环岛赛体彩网 七星彩走势图最近100期